
UNITFiber Tapering Equipment
Long Lead Screw Fiber Taper (XQ7170)
XQ7170 is used mainly for manufacturing high power (N+1)1/N1 optical fiber combiners and special cone-shaped fiber bundles. Its main feature is lengthening the tapering movement length (200-500mm) and it is equipped with special optical fiber holder and heater, very suitable for mass production and manufacturing of high power fiber combiners. XQ7170 is stable , reliable and easy to use.
Key Features
- Long taper range
- High repeatability
- Precision motion system
Applications
- Fiber lasers
- Specialty optical components
Technical Specifications
| Travel Range | Up to 300 mm |
| Motion Resolution | 0.1 μm |
| Drive Mechanism | Precision Lead Screw |
| Stability | Vibration-isolated base |



